The scope of work for this project includes the storage, delivery, and installation of a total of 358 computer room air-condition handling (CRAH) units, along with the necessary EC fans and internal power cable connections. The project also involves comprehensive testing and commissioning, which includes pre-testing and SAT (Site Acceptance Test). The objective of this project is to facilitate optimal cooling in the data centre, which is critical for sustaining the performance and reliability of the equipment housed within.